Update: got my 40ft container craned onto the lot in Tucson last month and the driver caught my gravel pad | Container Homes Builds - The Design Community Hub
Update: got my 40ft container craned onto the lot in Tucson last month and the driver caught my gravel pad
He told me the pad was off by 6 inches front to back, and it cost me $300 to reset the blocks before he'd set it down. Anybody else deal with a pad that reads level but isn't when the rig shows up?