I finally tried cutting my door openings before the container was set, and it beat doing it after
On my second build in Tucson last summer I cut the rough openings for the doors and windows while the box was still on the ground, then lifted it with the forklift. Squaring the frame to the floor before it gets tweaked by the pad saved me about 4 hours of fighting a warped opening with a grinder. Anyone else cut panels before setting, or do you wait till it's landed?
Cutting before the lift only helps if the frame is braced square while it's still on the ground, and that part is easy to miss. The box flexes when the forklift picks it up, so an opening that was dead square on the ground can still come out of whack once it lands on the pad. Saving four hours is real, but the part that saves you is bracing the frame first, not the timing of the cut. Warped openings usually come from the pad not being flat, and no amount of pre-cutting fixes that. Get the pad level and the frame braced and you'll be ahead either way.