Just realized my old finisher buddy was right about finishing in the heat
Had a chat with a guy I used to pour with down in Lubbock about 2 months back, and he told me to stop fighting the sun when the slab starts setting up too fast. He told me to get the water and shade going before the mud even hits the ground, not after. I tried it on a 12 yard driveway pour yesterday and the finish came out way smoother with fewer cold joints. What are you guys doing to keep a slab workable when it's pushing 100 out there?