Update: tried a ratchet strap over the bungee cord for my umbilical on the dock job in Duluth
Last week I had to run 80 feet of hose along a wet dock in Duluth and my old bungee setup kept slipping every time the tide moved, so I swapped to a ratchet strap on the last leg and it barely budged for 6 hours. The bungee felt quicker to clip on, but the ratchet held way better once things got wet and pulled. What's everyone else using to tie off a long hose run where the line keeps sliding?