DAE see guys soaking bricks in a wheelbarrow for 2 days before laying them?
Was on a job in Dayton last week and the guy next to me had a wheelbarrow full of bricks sitting in water since Thursday. I asked why and he said "so they don't suck the mortar dry," but nobody ever taught him the difference between soaked and saturated. Those bricks were dripping wet when he set them, and the mortar joints were still mush 3 days later. You only need a quick dip and let them dry to the touch, not sitting in a puddle overnight. Anyone else run into this on their crews, and how do you explain it without sounding like a know it all?