Can we talk about how I swore off hydraulic torque wrenches on tube sheets
For years I told anybody who'd listen that a slugging wrench and a deadblow was all you needed on a tube sheet, and that the hydraulic torque stuff was for guys who didn't want to learn feel. Then we got a bundle on a water wall job outside of Beaumont and the specs called for 1,100 foot pounds on 240 studs, and I ate my words about three hours into the first shift. The hand method had us chasing leaks on the hydro test twice, and the third time the contractor's engineer pulled the torque sheet and showed me my numbers were all over the map from stud to stud. We rented a hydraulic setup for $850 a week, and the next test held first try with every bolt within 3 percent. What got me wasn't the speed, it was that we had a printed record for every stud, which saved our tails when the inspector started poking around. Now I'm the guy telling the young hands to quit pretending their arm is a calibrated instrument. Anybody else get dragged into the hydraulic side kicking and screaming, or was it just me?