A 30 year boilermaker in Gary laughed at my torque sequence and now I get why
I was helping a guy retube a small firetube boiler outside Gary and I started snugging the tube sheet bolts in a circle like I always do. He stopped me and asked how many passes I was planning, and I said one and done. He pulled out a worn copy of a torque table from 1994 and walked me through doing it in a cross pattern at 40, 70, and 100 percent, three passes minimum. I figured that was overkill for a little 60 HP unit, but he pointed at a hairline leak on the last job he skipped it on and said it cost them a full redo. We did it his way and every bolt pulled even on the first check with a feeler gauge. Now I'm second guessing every gasket job I rushed through the past two years. How many passes do you all run on tube sheets, or does it depend on the size?