Wired a 40 foot dock run in one trip because I labeled every wire first
Last Thursday I had a dock job on Lake Murray with 14 cameras and 2 keypads, and I finally tried labeling both ends of every cable before pulling. Usually I'm up and down that ladder 20 times, but this time I finished the rough-in by 1pm and the panel was clean on the first power up. My helper said he'd never seen me not cuss at a bundle of cat6. It was just one good day, but I want to make it a habit. Do you all label during the pull or after everything is run?